Our website will be undergoing maintenance between Saturday, August 16, 2025 at 10:00 pm until Sunday, August 17, 2025 at 4:30 pm Eastern Standard Time. During this time frame, no orders can be placed, and website access may be limited. We appreciate your patience. Thank you.
VHP-200 Series Fittings Instruction Guide
by
IDEX Health & Science
Slide the nut, back ferrule and front ferrule, in that order, onto the tubing as shown in the image. The wider end of both ferrules faces towards the nut.
Insert assembly into the receiving port. Push the tubing into the port until it bottoms out.
Slide nut and ferrules down until the threads engage. Tighten using the nut to finger-tight.
Place a wrench on the nut and tighten the fitting to: 20 in*lbs (2.26 N*m).